Skip to Main Content
Prime PathPainting & Drywall
CSI 09 91 00

Commercial Painting

Full commercial painting packages for general contractors, developers, and owners, new construction, tenant finish-outs, and remodels held to the construction schedule.

Scope
Commercial Finishes, Built for Texas
Delivery
Coordinated project team
Scheduling
Day, night & occupied-site shifts
Warranty
1-year workmanship warranty
Overview

Commercial construction is where this company was built and where most of our crews work every day. We carry complete Division 09 packages, submittals, mockups, production, quality control, and closeout, sequenced against the general contractor schedule and staffed against the area release plan instead of an ideal duration.

Built Around the Schedule

Painting sits behind drywall and ahead of flooring, casework, and equipment, so it absorbs every upstream delay. We plan the compressed version of the schedule from day one, add shifts not move dates, and tell the superintendent early when something upstream is going to move us.

One Subcontractor, Closeout Included

Attic stock, the approved color schedule, product data, and a written one-year workmanship warranty are delivered as a package at turnover. Our own quality walk happens before the general contractor walkthrough, which is why the punch list handed over is short.

Commercial Painting — illustrative service image
Systems & Substrates
Gypsum Board
Primer plus two finish coats per the finish schedule
Hollow Metal
Rust-inhibitive primer with enamel topcoat
Exposed Structure
Dryfall applied ahead of MEP close-in
Exterior Envelope
Manufacturer-specified assembly for the substrate
Included in a Bid

What This Scope Actually Covers.

Listed so there is no ambiguity at award. Anything not on this list is either excluded or priced separately, and the proposal says which.

Full Division 09 painting packages for new construction
Tenant finish-outs delivered to lease commencement dates
Remodels phased around trading hours and occupants
Multi-site and rollout programs to a brand prototype standard
Submittals, color schedules, and approved mockups
Day, night, and occupied-site shift scheduling
Progressive punch and documented closeout
Where This Scope Runs

Sectors That Buy This Service Most.

Common Questions

Before You Bid It Out.

Do You Handle Multi-Site Rollout Programs?
Yes. We can coordinate multi-site painting scopes with the same finish requirements across locations. The finish schedule is verified against the brand prototype book during preconstruction and substitutions are flagged in writing before material is ordered.
Can You Work While a Business Stays Open?
Yes. Night shifts, barricaded phasing, and daily return to service are standard. The shift structure is agreed and priced at bid, so there is no premium-time surprise later.
Bid Invitations

Add Commercial Painting to Your Next Bid List.

Send the plans, the specification sections, and the due date. We confirm receipt and tell you whether we are bidding, so you are never left waiting on a no-bid.